Project cargo, planned route by route

Transformer relocations, prefabricated modules, wind turbine sections, oilfield equipment — moved on low-loaders and modular trailers with the route survey done long before the cargo leaves the yard.

A heavy transformer being moved on a low-loader trailer along a highway
Equipment on call

The trailers that move what regular fleets can't

For oversized and overweight cargo we mobilise specialist trailers from our own pool and partner network — selected against the weight, dimensions, axle load tolerance, and route conditions.

  • Low-bed semi-trailers (4-axle to 8-axle) for plant up to 120 t
  • Hydraulic modular trailers for distributed-load cargo to 300 t
  • Extendable flatbeds for wind blades and structural members
  • Self-propelled modular transporters (SPMT) via partner mobilisation
  • Crane spread coordination for end-to-end lift-and-shift jobs
How a project moves

From feasibility study to delivered position

Route survey

Bridge clearances, road widths, swept-path simulation, and overhead utility checks done by our project engineers before commercial commitment.

Permits & escort

JKR oversize permits, JPJ axle-load approval, and Polis DiRaja Malaysia escort coordination — lodged in the customer's name when required.

Mobilisation

Equipment positioning, dunnage and lashing engineered to BS EN 12195, and a method statement issued to all stakeholders.

Move & handover

Move under escort, with surveyor in attendance for high-value cargo, and a signed delivery certificate at the final position.

Projects we've already moved

A representative sample from the last 24 months — names withheld under standard non-disclosure terms.

  • Two 87-tonne transformers from Port Klang to a substation site in Pahang, including bridge-by-bridge load assessment along Route 8.
  • Sixteen 65 m wind turbine blades from Westport to a wind farm assembly area in Kedah, escorted in convoys of two during night-time windows.
  • Modular accommodation units (42 pieces, 24 t each) moved from Pulau Indah to a construction camp near Kerteh in 11 nights.
  • A 220-tonne press base shifted from a Penang foundry to a Tier-1 automotive plant in Bangi via SPMT, with road closure permits.

Have a project cargo brief?

Send dimensions, weight, origin, and destination — we'll come back with feasibility, route notes, and a costed plan.